Typical Industrial
Switchboard Projects

Check out the various industrial switchboards we have worked on over the years

bg triangle top left
Warrnambool
Description

Project included a adding an Ultraviolet disinfection system. As well as replacing the filter backwash pumps with a new backwash pumping system and lime dosing system.

Features

Danfoss VLT Harmonic Filter 75KW,
Danfoss Aqua 75KW VSD’s,
Allen Bradley Compact 5000 PLC,
Rittal Roof Exhaust Fans,

Scope

Design, construction

Forbes Brine Evaporation
Description

Main panel for an EVAPX Brine Evaporation system. The plant will remove excess water from brine used to cure hides in the agricultural industry

Features

Siemens ET200SP PLC CPU,
Weintek 15” HMI,
Powershield centurion 2000VA,
Powershield extended battery module tower version,

Scope

Design, construction, programming, onsite commissioning, remote support

Mt baw baw 300 x 192
Description

Control panel for a state-of the-art sewage treatment plant for processing of sewage from Baw Baw Village lodges and public amenities.

Features

10 x ABB ACS310 VSD’s,
Weintek 10” HMI,
Siemens ET200SP PLC,
Ewon Router Modem Cosy + 4G EU

Scope

Design, construction, programming

Cannington Mine Reverse Osmosis
Description

Board for a containerized RO treatment plant in a QLD mine

Features

Allen Bradley Panel View 7 10” HMI,
Allen Bradley CompactLogix PLC,
Allen Bradley I/O Adapter Module,

Scope

Design, construction, programming, remote commissioning

Description

A waste water treatment plant (WWTP) for the Meridian coal seam gas (CSG) field in Central Queensland, near the town of Moura. The field currently produces 40 terajoules of gas per day.

Features

Schneider Altivar 650 VSD’s,
Weintek 15” HMI,
MTE Filter Passive 83A,
Siemens ET200SP PLC

Scope

Design, construction

Description

The Ranger Mine Osmoflo Brine Squeezer OBS Treatment Plant is used as a treatment solution to concentrate brine from the existing desalination plants at the site as part of its mine closure and rehabilitation programme. The OBS plant at the mine was help maximise the conversion of contaminated wastewater to water suitable for environmental release.

Features

B&R Signature Series Enclosure,
Schneider 1600A 50kA 3P MCCB’s,
Schneider ACV withdrawable manual 2500A 66kA,

Scope

Design, construction

Description

Motor Control Centre for a sewage treatment plant at Peak Downs Open Cut Coal Mine. This was part of a $2 Billion continuation project to upgrade existing infrastructure and also construction of new infrastructure

Features

B&R Enclosure,
Cisco Catalyst IE330 8P2S,
Littlefuse Earth Leakage Relay 230VAC relays,
Schneider Altivar VSD’s

Scope

Design, construction, PLC & SCADA programming, onsite commissioning

Description

Motor Control Centre for a Construction Water Treatment Plant (WTP) at the Snowy Hydro 2.0 project. Snowy 2.0 is a pumped hydro-electric project that will link the existing Tantangara and Talbingo reservoirs through a series of new underground tunnels and a hydro-electric power station.

Metroid’s custom built switchboard will provide the “brain power” to the project. With our PLC programming, the HMI will highlight the overview of the WTP and general settings such as Balance Tank Level Setpoints, UF Established Setpoints, UF Duration Timers, Filter pump speed, RO level setpoints, RO duration timers, RO pump speed, TW Level Setpoints and more.
Our programming also highlights trend variables, PID settings, alarms and more.

Certificate of Compliance provided AS3000:2018 & AS61439.1:2016

Features

Schneider Altivar VSD’s,
Rittal TS8 Enclosures,
Siemens Et200SP PLC,
Weintek 10.1” HMI

Scope

Design, construction, programming

Description

Control panel for a water treatment plant designed to remove pollutants from the bore water in Laramba to meet Australian drinking water guidelines

Features

11 x ABB ACS480 VSD’s,
Allen Bradley ControlLogix PLC,
Weintek 10.1″ HMI

Scope

Design, construction, programming, remote FAT at Metroid, on - site commissioning