Location
Laramba, NT
Description
Control panel for a water treatment plant designed to remove pollutants from the bore water in Laramba to meet Australian drinking water guidelines
Features
11 x ABB ACS480 VSD’s,
Allen Bradley ControlLogix PLC,
Weintek 10.1″ HMI
Scope
Design, construction, programming, remote FAT at Metroid, on - site commissioning