Typical Industrial
Switchboard Projects

Check out the various industrial switchboards we have worked on over the years

bg triangle top left
Hydrated Lime Pneumatic Transfer MCC
Description

MCC for a hydrated lime pneumatic transfer system. Transferring from the bulk tanker unloading area to an existing 250t lime silo

Features

Allen Bradley CompactLogix PLC,
Allen Bradley PanelView PLUS 7 HMI
Schneider Soft Starters,
Tembreak Pro MCCB’s

Scope

Design, construction

Shoalhaven Sewage Pump Stations
Description

Shoalhaven City Council required the design, manufacturing and delivery of 11 outdoor sewage pumping station electrical control panels. Throughout the design process Metroid worked closely with Shoalhaven City Council to update their standard design to be more operator friendly and safe.

Features

Omron CJ1 PLC,
10.4” Schneider HMI
Schneider SCADAPACK 344
Danfoss MCD600 Softstarters
316SS Form 3bih enclosure

Scope

Design, construction, FAT and delivery

Inghams Automatic Waste Water Recycling Plant
Description

The $15 million project by Inghams is to improve their sustainability with a more modern and expanded plant efficiently treating water and reducing odour emissions. The recycling water system is expected to reduce incoming water supply by 40%

Features

22 x ABB ACQ580 VSD’s,
Allen Bradley Panel View Plus 7 12” HMI,
20 pumps on DOL, 10 pumps on Soft Starters,
Allen Bradley CompactLogix PLC

Scope

Design, construction, programming

Gamuda Sydney Metro Tunnelling WTP
Description

Main MCC for a the Sydney Metro Tunnelling West Water Treatment Plant. This was part of an underground railway works that was helping connect Greater Parramatta and the Sydney CBD.

Features

32 Schneider VSD’s,
Advantec 19” Touch Screen HMI,
Siemens S7-1500 PLC

Scope

Design, construction

Wirraglen 300 x 192
Description

Pump station for Toowoomba Regional Council. The new infrastructure included trunk gravity sewers, pressure rising mains and a sewer pump station

Features

2 x 7.5KW pumps on VSD’s
Schneider VSD’s,
Schneider passive harmonic filters,
Schneider M340 PLC,
5.7” Schneider HMI

Scope

Design, Construction

Warrnambool
Description

Project included a adding an Ultraviolet disinfection system. As well as replacing the filter backwash pumps with a new backwash pumping system and lime dosing system.

Features

Danfoss VLT Harmonic Filter 75KW,
Danfoss Aqua 75KW VSD’s,
Allen Bradley Compact 5000 PLC,
Rittal Roof Exhaust Fans,

Scope

Design, construction

Pool Switchboard
Description

Control panel for a swimming & fitness centre including: learn to swim pool, wellness program pool, 50 metre pool, aquatic adventure play and a toddlers zero depth pool.

Features

8 x Schneider ATV630 VSD’s,
Weintek 10” HMI,
Siemens ET200SP PLC,
5 pumps on DOL

Scope

Design, construction, programming

Bombala Sewage Pump Station
Description

Sewage pump station upgrade to prevent wet weather overflows in the Monaro Region

Features

2 x 4.4kW pumps on Soft Starters,
Omron CP1 PLC,
AuCom EMX3 soft starters,
Omron HMI

Scope

Design, construction, programming

Mcarthur River Scrubber 300 x 192
Description

Control switchboard for a concentrate storage fume scrubber

Features

316 stainless steel enclosure,
Allen-Bradley MicroLogix PLC,
Designed and built to MRM specifications

Scope

Design, construction, programming, remote commissioning