Water treatment

Water Treatment Control Switchboards

bg triangle top left

With decades of experience in every common type of water treatment system, Metroid’s engineers can help make your project seamless and stress-free.

Having completed over 800 water treatment projects, we have extensive experience in designing, building, programming, commissioning, and troubleshooting water treatment projects of all sizes, including AS61439 compliance.

bg triangle top left

Some of the leading companies we've helped OEMs & contractors deliver water treatment projects for:

Metroid has over 800 successful water treatment projects and decades of experience with every common type of water treatment system:

Aquila Mine STP and WTP
Description

Project for a client that required a full complete package water treatment plant and mine sewage treatment plant, including 5 pump stations, 18 local control stations, 3 remote HMI panels and a power distribution panel. All 7 control boards had to talk to each other, including some of the boards which were over 1km away.

Features

WTP and STP boards being built to Form 4b suitable for installation,
6 Allen Bradley CPUs – programmed to client and site specifications,
Fibre optic panel,
Schneider motor management relay,
Custom made stainless steel pump stations

Scope

Design, construction, programming

caval ridge sewage treatment plant
Description

Motor Control Centre manufactured to BMA Spec for the Caval Ridge Coal Mine sewage treatment plant.

Features

IP42 20A Form 4A BMA Spec Enclosure,
Installed in an IP56 Kiosk,
Allen Bradley CompactLogix PLC,
Schneider Power Meter PowerLogic

Scope

Design, construction, programming, commissioning

Inghams Automatic Waste Water Recycling Plant
Description

The $15 million project by Inghams is to improve their sustainability with a more modern and expanded Waste Water Recycling plant efficiently treating water and reducing odour emissions. The recycling water system is expected to reduce incoming water supply by 40%

Features

22 x ABB ACQ580 VSD’s,
Allen Bradley Panel View Plus 7 12” HMI,
20 pumps on DOL, 10 pumps on Soft Starters,
Allen Bradley CompactLogix PLC

Scope

Design, construction, programming

Gamuda Sydney Metro Tunnelling WTP
Description

Main MCC for a the Sydney Metro Tunnelling West Water Treatment Plant. This was part of an underground railway works that was helping connect Greater Parramatta and the Sydney CBD.

Features

32 Schneider VSD’s,
Advantec 19” Touch Screen HMI,
Siemens S7-1500 PLC

Scope

Design, construction

Testimonials

bg triangle top left