Location
Gippsland, Victoria
Description
Control panel for the Upgrades of the Gippsland Aquatic Centre. The facilities upgrade includes a indoor water play zone, warm water therapy pool with spa, learn to swim pool, 25 metre outdoor pool, and two large water slides. The centre also included a 50 metre eight lane indoor pool.
Features
5 x ABB ACS310 VSDs
Weintek 10″ colour HMI
Siemens S7-1200 PLC w/ remote IO
Scope
Design, construction, programming, commissioning