Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
A Metroid electrical switchboard for a mining site
Industries›Mining
Mining & Quarrying

Control solutions for mine & quarry sites.

Extensive experience designing, building, programming and commissioning control switchboards for mining and quarrying projects across Australia and overseas.

Proven Expertise
Systemised Execution
Genuine People
Built for Mine & Quarry Sites

Extensive experience across mining and quarrying.

Metroid has designed, built, programmed and commissioned control switchboards for a wide range of mining and quarrying projects across Australia and overseas.

From conveying systems and dewatering to camp water and sewage treatment, we bring in-house engineering and manufacturing to even the most demanding, remote sites. And we don’t disappear at handover – with remote support, programming expertise and spare-parts backing, we help keep your plant running reliably for its whole life, not just its first day.

Explore applications →
Metroid mining water treatment plant switchboard
Mining Experience

Proven control systems experience across the full range of mining applications.

We’ve delivered control switchboards for a broad spread of mining and quarrying applications, including:

Mining & quarrying conveying systemsMining sewage treatment plantsMining potable water treatmentMining campsQuarry aggregate mixing plantsOily water separation systemsMining wash baysQuicklime slaking plantsRare mineral bulk bag filling linesMining evaporator systemsMining ventilation systemsMining sewage pump stationsBulk lubrication storage systemsMagnesium oxide unloading systemsMine dewatering systemsMine bore systemsLithium centrifuge systemsMining fume scrubbers
Compliance

Over 30 years building to standards.

Every switchboard is designed and built to comply with your mine site specifications and all relevant Australian standards, including:

AS/NZS 3000
Wiring rules
AS/NZS 61439
Low voltage switchgear & controlgear assemblies
AS 4024
Safety of machinery
AS/NZS 5638
Electrical equipment for mines & quarries
AS/NZS 4509
Standalone power systems
AS 2081
Electrical protection devices for mines & quarries
WA WHS (Mines) Regulations 2022
Work health & safety compliance
Switchboard factory acceptance testing for compliance
Factory acceptance testing

We supply to sites nationally and internationally.

Mine Site Specifications

Full compliance with every mine site’s specs.

Metroid ensures full compliance with the unique specifications of each mine site.

We’ve delivered projects for hundreds of high-profile end clients across mining, municipal, food and beverage manufacturing, energy and other critical infrastructure applications, and are well versed in meeting stringent end-client specifications.

Switchboard wire testing for compliance
Mining Clients

Delivering for Australia’s leading miners.

Some of the mining clients we’ve delivered projects for include:

  • Adaman Resources
  • AGL Macquarie
  • Agnew Gold
  • Alcoa
  • Anglo American Coal
  • Anglo Grosvenor
  • Atlas Iron
  • Atom Minerals
  • BCI Minerals
  • BG&E Resources
  • BHP
  • BMA
  • BMA Blackwater
  • BMA Goonyella
  • BMA Saraji
  • Boggabri Coal
  • Coburn Resources
  • Cockburn Cement
  • CSA Mine
  • Dacian Gold
  • Endeavour Mining
  • Ensham Resources
  • Evolution Mining
  • FMG
  • Fosterville Gold
  • Gladstone LNG
  • Glencore
  • Heathgate Resources
  • Hillgrove Mines
  • Idemitsu Australia
  • IGO Nova
  • Iluka
  • Independence Group NL
  • Larvotto Resources
  • Lynas
  • Meridian CSG
  • Newcrest Mining
  • Oil Search
  • Oyu Tolgoi
  • Pensana
  • Port Waratah Coal Services
  • Rio Tinto
  • Rio Tinto Koodaideri Project
  • Rio Tinto Mesa J
  • RMS
  • Roy Hill
  • RTIO Amrun Project
  • Santos
  • St Ives Gold Mine
  • Tronox
  • YanCoal
Case Studies

Mining projects we’ve delivered.

Aquila MCC on the factory floor
Aquila Mine, QLD

Aquila Mine Water & Sewage Treatment Plant

A complete, networked electrical control package for two treatment plants on a remote Queensland mine site, designed, built and programmed in-house.

Peak Downs Coal Mine Sewage Treatment Plant - Switchboard
Winchester, QLD

Peak Downs Coal Mine Sewage Treatment Plant

Motor Control Centre for a sewage treatment plant at Peak Downs Open Cut Coal Mine. This was part of a $2 Billion continuation project to upgrade existing infrastructure and also construction of new infrastructure

German Creek Sewage Treatment Plant - Switchboard
Middlemount, QLD

German Creek Sewage Treatment Plant

Motor Control Centre for the German Creek mine sewage treatment plant. The STP wet weather system is designed to control and manage irrigation/storage of treated effluent.

Let’s power your next mining project.

Proven ExpertiseSystemised ExecutionGenuine People
Request a quote →