We are hiring! See vacancies here.
bg_img
Metroid has extensive experience in designing, building, programming, commissioning and troubleshooting control systems for commercial pool projects of all sizes.
  • Pool filtration
  • Chemical dosing
  • Backwash control
  • UV disinfection systems
  • Electrochlorination
  • Heating and temperature control
  • Water features
  • Remote display panels for lifeguard stations
bg_img

Typical Projects

title_divider

East Keilor Leisure Centre

Location

East Keilor, Victoria

Description

Motor control centre for a leisure centre pool filtration system (includes a 50m, 25m, spa, program and learn to swim pools, and an aquaplay

Features

13 pumps on VSDs, 10+ pumps on DOL, 280+ IOs on a Siemens S7-1200 PLC, 4G Remote monitoring access

Scope

Design, construction, PLC/HMI programming, and commissioning

East Keilor

Kardinia Aquatic Centre

Location

Geelong, Victoria

Description

Control switchboard for new 25m and learn-to-swim pools

Features

Omron PLC and 10” HMI, Toshiba VSD’s, Remote access capability

Scope

Design, construction, programming, remote commissioning and integration

Kardinia Aquatic Centre

Kangaroo Flat Aquatic Centre

Location

Bendigo VIC

Description

Main control board for a new aquatic centre, including 50m competition pool, program pool, LTS pool and aquaplay

Features

Siemens PLC and 17″ HMI, Omron VSDs, SMS alarm functionality, Full remote access and control via internet

Scope

Design, construction, PLC and HMI programming and commissioning

Kangaroo Flat Aquatic Centre

Parkinson Aquatic Centre

Location

Parkinson QLD

Description

Control switchboard for aquatic centre upgrade, including 50m and program pools

Features

Omron PLC and 7″ HMI, Toshiba VSDs, Full remote access capability over the Internet

Scope

Design, construction, PLC and HMI programming and remote commissioning assistance

Parkinson Aquatic Centre

Rockhampton 42nd Battalion Memorial Pool

Location

Rockhampton, Queensland

Description

Control switchboard for upgraded 50m pool and wading pool, including control for filtration pumps, filter backwash cycles, pool heating and monitoring of pool chemistry

Features

Omron PLC and 7" HMI, Schneider VSDs, Full remote access capability over the Internet

Scope

Design, construction, programming and remote commissioning

Rockhampton 42nd Battalion Memorial Pool

Craigieburn Aquatic Centre

Location

Melbourne, Victoria

Description

Control switchboards for new competition pool, program pool, spa, LTS, leisure and toddler pools; water play and slides; including control for filtration pumps, filter backwash cycles, pool heating and monitoring of pool chemistry

Features

Siemens PLC and 17″ HMI, SMS alarm functionality, Full remote access capability over the Internet

Scope

Design, construction, programming, onsite and remote commissioning and integration

Craigieburn Aquatic Centre

Testimonials

title_divider

“Thank you once again for the delivery of the panel on time and in full working order. We have the panel mounted and wired up and we were able to complete our in house factory acceptance test today in preparation for a visit by RioTinto tomorrow. In fact, this was one of our best FATs in a while, with everything functioning exactly as it should.

I can assure you that the word amongst our engineers is “we have complete confidence in Metroid, and know that when they deliver a panel it will work first time, every time”.

It has been a pleasure to work with you on this project and you were able to rise to the challenge of a tight delivery schedule and technical complexity…and in the end you made it look easy.”

- Ivan, Project Manager

“Love the excellent quality products and the fast response to quote requests.”

- Luke, Sales Engineer

“Metroid provide an excellent service for all of our electrical engineering needs. Our industry demands innovation which Metroid are always providing on each new project.

The entire team make a project easy from the initial tender through to the design and commissioning process. We look forward to many more successful projects in the future!”

- Steve, Project Manager

“Leadtimes are very competitive.”

- Jason, Project Manager

“Just a quick note of thanks to the Metroid team for your fast and accurate technical help with the controls for this ultrafiltration package.

Emails were responded to within the hour and client queries addressed very professionally. This assistance and level of support for critical plant such as controls for this Ultrafiltration package is much valued and gives us the needed confidence for future repeat business.

Rod is an excellent commissioning engineer and his “hands-on” expertise on site was much appreciated – we will definitely use Metroid again!”

- Drew, Project Manager

“Please pass on our thanks to Martin and your estimating team for your timely technical quotations received recently.

The short turn-around time has really helped us get our packaged treatment plant proposal into client well before deadline. Waiting for supplier quotes is one of our biggest delays in getting quotes to clients on time and Metroid’s speedy service is much appreciated – whilst fast we noticed you covered all the detail very thoroughly as well – good job keep it up!”

- Matt, Project Manager

“It is awesome to have Rod assisting with our projects. He is an excellent operator.”

- Brendan, Engineer

“We always get fast response, and good communication on all stages of a project. Everyone is very knowledgeable.”

- Harry, General Manager

“Always think through the drawings, with great design of electrical circuit and quick response.”

- Andy, Process Engineer

“Thank you again for your time and attention in this matter, as with all your help at Parkinson it’s greatly appreciated.

We’ve had nothing but good service from Metroid and it doesn’t go unnoticed.”

- Cobey, Contracts Manager

“Metroid’s people have definitely left a good impression on this first job with professionalism and pleasant natured people to deal with.

Please pass this feedback onto the others and let them know the effort to dispatch prior to the Christmas break is much appreciated. We look forward to working with you on future projects and wish you all a safe and happy Christmas.”

- Chris, Project Engineer

“Quick turnaround on switchboard pricing, drawing design/changes and fabrication of panels.”

- Michael, Project Manager

“Congratulations to the team at Metroid. We really appreciate you working towards achieving a tight delivery time frame, whilst still being able to respond to the complex specifications.

Looking forward to receiving the panel next week, and having your professional staff commission it with us.”

- Simon, Contracts Manager

“Congratulations to your engineers on this project: most jobs from other suppliers have not had this detail up front.”

- Mohammad, Process Engineer

“You guys are like greased lightning, thanks again for your fast response!”

- Luke, State Manager

“I know that I will always get the correct solution to my needs.

Everyone within the organisational is knowledgeable and offers the correct information, and do so with a great attitude.”

- Ian, Project Manager