Family-owned & operated since 1993
Certified Great Place to Work™ 03 5442 5444
Metroid Electrical Engineering
Greywater Treatment Plant
Projects›Case study
Greywater Treatment Plant

Greywater Treatment Plant

Location
Tuggeranong, ACT
Industry
Water – Industrial
Scope
Design, construction, programming
The Project

Project overview.

PLC control switchboard for a packaged wastewater treatment plant. The plant use membrane bioreactor (MBR) technology to treat greywater for reuse

Greywater Treatment Plant - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Omron PLC
  • Weintek HMI
  • Toshiba VSD
  • Full remote access via 3G network

Have a project like this?

Proven ExpertiseSystemised ExecutionGenuine People
Request a quote →