The Project

Project overview.

Board for a rail cutting stormwater and groundwater pump station for a level crossing removal project

Bayswater Level Crossing Removal - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • 2 x 37kW pumps on VSDs
  • 1.8kW and 1.45kW pumps on DOL
  • Omron CP1 PLC
  • AuCom Soft Starters
  • ABB watermaster flow meter
  • ABB CM15 Universal process indicator
  • Schneider ATV6137kW VSDs