Scope
Design, construction, programming, commissioning
The Project

Project overview.

Control panel for a water tube boiler, deaerator and feed tanks.

ABC Tissues Water Tube Boiler - Switchboard
FEATURES & SPECIFICATIONS

Built to spec, built to last.

Board specifications

  • Allen Bradley MicroLogix 1400 PLC
  • Weintek 10” HMI
  • Ewon 4G router modem