Location
Waroona, WA
Description
The PFAS treatment plant is designed to process PFAS affected water to ultra trace levels from two pre-treatment dams with a combined minimum operational capacity of 110ml. The
water treatment plant is designed to process PFAS affected water at 10 L/s or 25.9ML per month. The WTP will operate continuously and will be fully automated apart from Polymer make-up and Sludge waste disposal.
Features
Form 3bih 2.0mm 316SS Brushed
Stainless Enclosure,
Allen Bradley Contrologix PLC,
Weintek 15” HMI,
ABB ACS480 VSD’s
Scope
Design, construction, programming