Location
Tuross, NSW
Description
Upgrades to the Tuross Head Sewage Pump Station to accommodate the growing population and protect the surrounding waterways. the Eurobodalla shire council decided to improve the infrastructure. This pump station is the final pump station before reaching the treatment plant. The board required an input for a standby generator to keep the system operating during power outages.
Features
Schneider SCADAPack 474 RTU,
Allen Bradley SMC Flex Soft Starters,
2mm 316 Stainless Steel Powdercoated with T45 Cootamundra,
Marechal 150A Generator Inlet
Scope
Design, construction