Location
Maryborough, VIC
Description
Part of a $17million expansion on production capabilities and waste management. The installation of a new WWTP (wastewater treatment plant) and box drying equipment is estimated to nearly double the facilities ability to turn blood waste from abattoirs to protein powders for animal consumption to 55,000 tonnes per annum.
Features
24 x ABB ACS580 VSD’s
AVEVE Intouch SCADA,
ABB ACS580 55KW VSD’s,
Siemens S7-1500 PLC,
Form 3bih 630A MCC
Scope
Design, construction, programming, SCADA programming, onsite and remote commissioning