Location
Muja, WA
Description
This MCC was manufactured for the Muja potable water treatment plant. The WTP is required to treat raw water sourced from deep underground bores and produce potable water which complies with all requirements of the Australian Drinking Water Guidelines. The WTP is to be operational 22 hours per day.
Features
Danfoss FC-302 Inverter Drives,
Siemens S7-300 PLC,
Remlive Indicator 3ph isolator check
Scope
Design, construction, onsite commissioning