Location
Marrangaroo, NSW
Description
This SPS project involved replacing an existing switchboard that had reached the end of its lifecycle. The sewage pump station is located at the Lithgow Correctional Centre, a maximum security institution.
Features
Schneider Soft Starters,
Weintek 10.4” HMI,
Omron CP1 PLC,
IP56 Form 3bih enclosure
Scope
Design, construction, programming