Location
Cullen Bullen, NSW
Description
Motor Control Centre for a wastewater treatment plant for the township of Cullen Bullen. The project is to replace the existing septic tank system with a pressure driven reticulation system that will send effluent from the township to a WWTP for treatment. Providing a more reliable and centralised sewage treatment system for local residents.
Features
EcoStruxure GeoSCADA,
Omron CJ2M PLC,
Schneider ATV320 VSD’s
Scope
Design, construction, programming, SCADA programming, commissioning