Typical Industrial
Switchboard Projects

Check out the various industrial switchboards we have worked on over the years

bg triangle top left
Swimming & Fitness Centre Switchboard
Description

Control panel for a swimming & fitness centre including: learn to swim pool, wellness program pool, 50 metre pool, aquatic adventure play and a toddlers zero depth pool.

Features

8 x Schneider ATV630 VSD’s,
Weintek 10” HMI,
Siemens ET200SP PLC,
5 pumps on DOL

Scope

Design, construction, programming

Torquay Wellness Centre
Description

Provided control at the Torquay Wellness Centre for the following, Outdoor kidney pool, Outdoor Magnesium Pool, outdoor cold plunge pool, indoor magnesium pool, indoor cold plunge pool, private outdoor magnesium pool, private outdoor cold plunge pool.

Features

Weintek 15” HMI,
Schneider ET200SP PLC,
Schneider Soft Starters,

Scope

Design, construction, programming, onsite and remote commissioning

Northern Aquatic & Community Hub
Description

Control panel the Northern Aquatic & Community Hub for a 25 metre pool, warm water pool, learn to swim pool, water play area and a waterslide

Features

ABB ACS580 VSD’s,
Advantech 17” Resistive Touch HMI,
Siemens ET200SP PLC,
16 pumps on DOL, 2 pumps on soft starters.

Scope

Design, construction, programming

Leisurelink Aquatic & Recreation Centre
Description

Control panel for a LeisureLink Aquatic & Recreation Centre. It was an upgrade to an existing system with required onsite programming modifications.

Features

8 pumps on ABB ACS580 VSD’s
2 pumps on DOL
Siemens S7-1200 PLC and 17″ HMI
500A type-tested control board

Scope

Design, construction, PLC / HMI programming and testing

Hyatt Centric Indoor Pool & Spa Switchboard
Description

Control panel for a hotel complex Hyatt Centric indoor pool and spa

Features

Omron CP1H PLC,
ABB ACS310 VSD’s,
Weintek 7” HMI

Scope

Design, construction, programming, onsite commissioning

Yamba Holiday Park Pool Switchboard
Description

Control panel for the Yamba Holiday Park in NSW. Our scope included treatment of the outdoor unheated lagoon pool and a heated spa pool.

Features

Schneider Altivar 650 VSD’s,
Weintek 10” HMI,
Siemens ET200SP PLC,
2mm 316 Statinless Steel Enclosure

Scope

Design, construction, programming

Tara Memorial Pool Replacement
Description

The Tara 25m Pool Replacement is a municipal aquatic facility in the Western Downs Regional Shire. The project involves the replacement of a dilapidated 50m pool with a new 25m pool, and replacement of filtration plant to the toddlers and waterplay systems along with the equipment room

Features

Siemens S7-1200 PLC,
ABB ACS310 VSD’s,
Weintek 10.1” HMI,
Ewon flexy router Base 4x Ethernet

Scope

Design, construction, programming, remote support

East Keilor Leisure Centre Switchboard
Description

Motor control centre for East Keilor Leisure Centre’s pool filtration system (includes a 50m, 25m, spa, program and learn to swim pools, and an aquaplay).

Features

13 pumps on VSDs,
10+ pumps on DOL,
280+ IOs on a Siemens S7-1200 PLC,
4G Remote monitoring access

Scope

Design, construction, PLC/HMI programming, and commissioning

Oatland Aquatic Centre
Description

Control panel for a state of the art Oatlands aquatic centre. The facility includes a six-lane 25-metre indoor swimming pool, a program pool and aquatic play area.

Features

4 x ABB ACS310 VSD’s,
Weintek HMI 10.1”,
Siemens S7-1200 PLC,
4 pumps on DOL

Scope

Design, construction, programming, on-site commissioning