Enter to win an iPad*! See us at Ozwater 2024 Trade Show.
bg_img
Metroid has extensive experience in designing, building, programming, commissioning and troubleshooting control systems for commercial pool projects of all sizes, including AS61439 Compliance.
  • Pool filtration
  • Chemical dosing
  • Backwash control
  • UV disinfection systems
  • Electrochlorination
  • Heating and temperature control
  • Water features
  • Remote display panels for lifeguard stations

Some of the leading companies
we've helped oems & contractors provide water treatment systems for:

bg_img

Typical Projects

title_divider

East Keilor Leisure Centre

Location

East Keilor, Victoria

Description

Motor control centre for a leisure centre pool filtration system (includes a 50m, 25m, spa, program and learn to swim pools, and an aquaplay

Features

13 pumps on VSDs, 10+ pumps on DOL, 280+ IOs on a Siemens S7-1200 PLC, 4G Remote monitoring access

Scope

Design, construction, PLC/HMI programming, and commissioning

East Keilor

Gippsland Aquatic Centre

Location

Traralgon, Victoria

Description

Control panel for 4 pools and a spa.

Features

5 x pumps on VSD 7 x pumps on DOL 4 x UF filters 5 x Chemical controllers and dosing pumps 3 x UV units Siemens S7-1200 PLC with 200+ IO's and 10" HMI 4G remote access modem

Scope

Design, construction, programming, testing, and remote support

Gippsland Aquatic

Caulfield Aquatic

Location

Caulfield, Victoria

Description

Pool filtration control panel for the new aqua facility at Caulfield Grammar

Features

3 x ABB ACS310 VSD's, Weintek 10" HMI, Omron CP1 PLC

Scope

Design, construction, programming, remote commissioning

Caulfield Aquatic

Netball & Hockey Centre

Location

Parkville, VIC

Description

Control panel for hot and cold recovery pools for the redevelopment of the redevelopment of the Victorian state Netball & Hockey Centre

Features

Weintek 10" HMI, Siemens S7-1200 PLC, ABB ACS310 VSD's, Ewon Cosy131 Router Modem

Scope

Design, construction, programming

Recovery Pool Switchboard

Oak Park Aquatic

Location

Oak Park, VIC

Description

Aquatic centre panel including an 8 lane 50m pool, 2 water slides, a kids pool and kids water play area

Features

7 x Schneider Altivar 212 VSD's, Active Harmonic Filter 35A 415VAC Siemens S7-1200 PLC

Scope

Design, construction, programming

Oak Park Aquatic Switchboard

Ikon Park Redevelopment

Location

Carlton, Vic

Description

Panel for a 25m lap pool, hot and cold recovery pool

Features

Advantech HMI 17" resistive touch 5 x pumps on DOL 4 x pumps on Schneider soft starters Siemens S7-1200 PLC Weintek driver for external HDMI

Scope

Design, construction, programming

Ikon Park Redevelopment

Testimonials

title_divider

“Thank you once again for the delivery of the panel on time and in full working order. We have the panel mounted and wired up and we were able to complete our in house factory acceptance test today in preparation for a visit by RioTinto tomorrow. In fact, this was one of our best FATs in a while, with everything functioning exactly as it should.

I can assure you that the word amongst our engineers is “we have complete confidence in Metroid, and know that when they deliver a panel it will work first time, every time”.

It has been a pleasure to work with you on this project and you were able to rise to the challenge of a tight delivery schedule and technical complexity…and in the end you made it look easy.”

- Ivan, Project Manager

“Love the excellent quality products and the fast response to quote requests.”

- Luke, Sales Engineer

“Metroid provide an excellent service for all of our electrical engineering needs. Our industry demands innovation which Metroid are always providing on each new project.

The entire team make a project easy from the initial tender through to the design and commissioning process. We look forward to many more successful projects in the future!”

- Steve, Project Manager

“Leadtimes are very competitive.”

- Jason, Project Manager

“Just a quick note of thanks to the Metroid team for your fast and accurate technical help with the controls for this ultrafiltration package.

Emails were responded to within the hour and client queries addressed very professionally. This assistance and level of support for critical plant such as controls for this Ultrafiltration package is much valued and gives us the needed confidence for future repeat business.

Rod is an excellent commissioning engineer and his “hands-on” expertise on site was much appreciated – we will definitely use Metroid again!”

- Drew, Project Manager

“Please pass on our thanks to Martin and your estimating team for your timely technical quotations received recently.

The short turn-around time has really helped us get our packaged treatment plant proposal into client well before deadline. Waiting for supplier quotes is one of our biggest delays in getting quotes to clients on time and Metroid’s speedy service is much appreciated – whilst fast we noticed you covered all the detail very thoroughly as well – good job keep it up!”

- Matt, Project Manager

“It is awesome to have Rod assisting with our projects. He is an excellent operator.”

- Brendan, Engineer

“We always get fast response, and good communication on all stages of a project. Everyone is very knowledgeable.”

- Harry, General Manager

“Always think through the drawings, with great design of electrical circuit and quick response.”

- Andy, Process Engineer

“Thank you again for your time and attention in this matter, as with all your help at Parkinson it’s greatly appreciated.

We’ve had nothing but good service from Metroid and it doesn’t go unnoticed.”

- Cobey, Contracts Manager

“Metroid’s people have definitely left a good impression on this first job with professionalism and pleasant natured people to deal with.

Please pass this feedback onto the others and let them know the effort to dispatch prior to the Christmas break is much appreciated. We look forward to working with you on future projects and wish you all a safe and happy Christmas.”

- Chris, Project Engineer

“Quick turnaround on switchboard pricing, drawing design/changes and fabrication of panels.”

- Michael, Project Manager

“Congratulations to the team at Metroid. We really appreciate you working towards achieving a tight delivery time frame, whilst still being able to respond to the complex specifications.

Looking forward to receiving the panel next week, and having your professional staff commission it with us.”

- Simon, Contracts Manager

“Congratulations to your engineers on this project: most jobs from other suppliers have not had this detail up front.”

- Mohammad, Process Engineer

“You guys are like greased lightning, thanks again for your fast response!”

- Luke, State Manager

“I know that I will always get the correct solution to my needs.

Everyone within the organisational is knowledgeable and offers the correct information, and do so with a great attitude.”

- Ian, Project Manager